Underfloor Heating Pipe Calculator
Available modes: Pipe length, Electric energy.
Enter a finite value within the formula’s domain and supported numeric range.
Loop count is a length-budget estimate. Route lengths are geometric; circuit layout, hydraulic balance and cable power ratings are not calculated.
Use the displayed units and your chosen coefficients. Approximate results show up to 12 significant digits. Blank optional prices leave costs undetermined. L=(A/(s/100)+L₀)(1+w/100); P=Ak/1000; E=Pht.
How the calculation works
Available modes: Pipe length, Electric energy.
Use the displayed units and your chosen coefficients. Approximate results show up to 12 significant digits. Blank optional prices leave costs undetermined. L=(A/(s/100)+L₀)(1+w/100); P=Ak/1000; E=Pht.
Approximate results show up to 12 significant digits.
Frequently asked questions
How is the result calculated?
L(m) ≈ [A(m²)/(s(cm)/100) + C(m)]·(1+p/100)
What assumptions apply?
Geometric estimate only: add the total supply and return connections yourself. Extra allowance applies to the whole length. Does not design heat output, loop limits, pressure loss or hydraulics.
How precise are the displayed results?
Approximate results show up to 12 significant digits. Use the displayed units and your chosen coefficients.
How we verified this calculator
The calculator is checked against 6 reference cases computed independently of its code. Last passed: .
| # | Inputs | Expected result |
|---|---|---|
| 1 |
Price / m = 4
|
Estimated cost: 602
|
| 2 |
Mode = Electric energy
Floor area (m²) = 15
P/A (W/m²) = 150
Hours per day (optional, 0–24) = 8
Number of days (optional, integer) = 30
Price / kWh = 0.2
|
Installed power (kW): 2.25
Period energy (kWh): 540
Estimated cost: 108
|
| 3 |
Mode = Electric energy
Floor area (m²) = 0
|
Installed power (kW): 0
Period energy (kWh): 0
|
| 4 |
Floor area (m²) = 0
|
Estimated pipe length (m): 10.5
|
| 5 |
Mode = Pipe length
Floor area (m²) = 20
Pipe spacing (cm) = 15
Total connection pipe length (m) = 0
Extra allowance (%) = 0
Entered length limit per loop (m) = 100
Price / m = 3
|
Estimated pipe length (m): 133.333333333
Minimum loops by total length: 2
Estimated cost: 400
|
| 6 |
Mode = Pipe length
Floor area (m²) = 15
Pipe spacing (cm) = 15
Total connection pipe length (m) = 0
Extra allowance (%) = 0
Entered length limit per loop (m) = 100
|
Estimated pipe length (m): 100
Minimum loops by total length: 1
|