Self Leveling Compound Calculator

Estimate leveling compound mass and whole bags.

Required mass (kg)
176
Whole bags
8

How the calculation works

m = A × d × r × (1 + p/100); N = ⌈m / B⌉

Use the consumption rate and permitted depth from your product sheet. Thickness is an average over the whole floor.

Values must satisfy the formula’s domain. Nonzero results too small or too large for reliable representation are rejected.

Frequently asked questions

How is the result calculated?

m = A × d × r × (1 + p/100); N = ⌈m / B⌉

What assumptions apply?

Use the consumption rate and permitted depth from your product sheet. Thickness is an average over the whole floor.

How precise are the displayed results?

Numerical results show up to ten significant digits. Rounding does not improve the accuracy of the input measurements or the model. Values must satisfy the formula’s domain. Nonzero results too small or too large for reliable representation are rejected.

How much cement and sand does a sand-cement screed need?

Screed volume = area × thickness plus about 10–15 % allowance. Per m³ of mortar: M150 (1:3) about 300 kg cement and 1,250 kg sand, M200 about 380 kg and 1,150 kg, M300 about 480 kg and 1,000 kg, plus roughly 190 L of water. For a ready-mixed dry screed enter about 1.8 kg/m²/mm as consumption here.

How we verified this calculator

The calculator is checked against 3 reference cases computed independently of its code. Last passed: .

# Inputs Expected result
1
Floor area (m²) = 20
Average depth (mm) = 5
Consumption (kg/m²/mm) = 1.6
Bag mass (kg) = 25
Extra material (%) = 10
Required mass (kg): 176
Whole bags: 8
2
Floor area (m²) = 45
Average depth (mm) = 8
Consumption (kg/m²/mm) = 1.5
Bag mass (kg) = 25
Extra material (%) = 5
Required mass (kg): 567
Whole bags: 23
3
Floor area (m²) = 12.5
Average depth (mm) = 3
Consumption (kg/m²/mm) = 1.7
Bag mass (kg) = 20
Extra material (%) = 0
Required mass (kg): 63.75
Whole bags: 4