French Drain Gravel and Fabric Calculator
Estimate trench volume, pipe displacement, gravel, fabric and whole pipe sections using your dimensions and density.
Check the active fields and units. Dimensions and prices must be nonnegative; divisors must be positive. Allowance is 0–100%.
Use the actual outside pipe diameter; zero means no pipe. The pipe must fit within both trench width and depth. Gravel volume is trench volume minus the pipe cylinder, plus allowance. Mass needs a density you supply. Fabric covers the bottom, both sides and your overlap width. Route length is always shown; no pipe means zero pipe length and sections. Section length is editable. This is a material estimate, not a hydraulic design. Use a decimal point, up to 12 digits before and after it, or scientific notation with exponent −24 to 24. Inputs in base units are limited to 10¹²; whole-piece results to 10⁹. Prices use one currency of your choice. Changing units preserves the quantity and price basis.
Method, assumptions and limits
Estimate trench volume, pipe displacement, gravel, fabric and whole pipe sections using your dimensions and density.
Use the actual outside pipe diameter; zero means no pipe. The pipe must fit within both trench width and depth. Gravel volume is trench volume minus the pipe cylinder, plus allowance. Mass needs a density you supply. Fabric covers the bottom, both sides and your overlap width. Route length is always shown; no pipe means zero pipe length and sections. Section length is editable. This is a material estimate, not a hydraulic design.
Use a decimal point, up to 12 digits before and after it, or scientific notation with exponent −24 to 24. Inputs in base units are limited to 10¹²; whole-piece results to 10⁹. Prices use one currency of your choice. Changing units preserves the quantity and price basis.
Frequently asked questions
How should I interpret this estimate?
Use the actual outside pipe diameter; zero means no pipe. The pipe must fit within both trench width and depth. Gravel volume is trench volume minus the pipe cylinder, plus allowance. Mass needs a density you supply. Fabric covers the bottom, both sides and your overlap width. Route length is always shown; no pipe means zero pipe length and sections. Section length is editable. This is a material estimate, not a hydraulic design. Use a decimal point, up to 12 digits before and after it, or scientific notation with exponent −24 to 24. Inputs in base units are limited to 10¹²; whole-piece results to 10⁹. Prices use one currency of your choice. Changing units preserves the quantity and price basis.
Should I enter the nominal pipe size or the outside diameter?
Enter the actual outside diameter: a nominal 4 in corrugated drain pipe is closer to 4.7 in outside, so it displaces more gravel than 4 in suggests. With a 12 × 18 in trench, a 4.7 in pipe takes about 0.12 ft³ per foot of trench out of 1.5 ft³.