Ramp Calculator
Choose two known values — rise and run, rise and slope, or run and slope — to get slope, angle, ratio and ramp length, plus run sections, landings and an optional cost.
Use one length unit for all lengths; blank optional fields are ignored.
Enter the two known values above 0 (slope up to 1000 %); optional fields must be above 0 for the max rise and at least 0 otherwise.
How ramp slope is calculated
Slope percentage is the rise divided by the run, multiplied by 100 — an 8.33% slope means the ramp climbs about 8.33 units of height for every 100 units of horizontal distance. This is the same measurement as a 1:12 ratio, commonly cited in accessibility guidelines.
The angle is found using the inverse tangent (arctan) of rise divided by run, while the ramp's actual surface length is found with the Pythagorean theorem: length = √(rise² + run²), treating the rise, run, and ramp surface as a right triangle.
Frequently asked questions
What does a 1:12 ramp ratio mean?
A 1:12 ratio means 1 unit of rise for every 12 units of run — equivalent to about 8.33% slope. This is a commonly referenced maximum slope ratio in accessibility design guidelines for wheelchair ramps, though exact requirements vary by jurisdiction and application.
Why does the ramp length differ from the run?
The run is the horizontal distance only, while the ramp's actual surface is longer since it travels diagonally upward — the difference becomes more noticeable at steeper slopes, where the ramp surface is meaningfully longer than its horizontal footprint.
Is this calculator a substitute for official accessibility code requirements?
No — this calculates the geometry only. Specific slope limits, landing requirements, handrail specifications, and other accessibility code requirements vary by jurisdiction and application, so always check your local building code for compliance.
How many landings does a long ramp need?
Divide the rise by the maximum rise allowed per run section and round up: that is the number of sections, and there is one level landing between each pair. ADA 2010 allows at most 1:12 (8.33 %) and 30 in (760 mm) of rise per run, with landings at least 60 in (1,525 mm) long. Brazil’s NBR 9050 allows 1.50 m per segment up to 5 %, 1.00 m up to 6.25 % and 0.80 m up to 8.33 %, with landings of at least 1.20 m. Example: 0.9 m rise with 0.76 m per section → 2 sections and 1 landing. Check your local code.
How we verified this calculator
The calculator is checked against 3 reference cases computed independently of its code. Last passed: .
| # | Inputs | Expected result |
|---|---|---|
| 1 |
Known values = Rise and run
Rise = 36
Run = 432
Max rise per run section (optional) = 30
Landing length (optional) = 60
Price per unit of ramp length (optional) = 4.1666666667
Price per landing (optional) = 200
|
Slope (%): 8.333333333
Angle: 4.763641691
Ratio 1 : n (n): 12
Rise: 36
|
| 2 |
Known values = Rise and run
Rise = 1
Run = 12
Max rise per run section (optional) =
Landing length (optional) =
Price per unit of ramp length (optional) = 100
Price per landing (optional) =
|
Slope (%): 8.333333333
Angle: 4.763641691
Ratio 1 : n (n): 12
Rise: 1
|
| 3 |
Known values = Run and slope
Run = 10
Slope (%) = 1000
Max rise per run section (optional) =
Landing length (optional) =
Price per unit of ramp length (optional) = 0
Price per landing (optional) = 0
|
Slope (%): 1000
Angle: 84.28940686
Ratio 1 : n (n): 0.1
Rise: 100
|