Work Days Calculator
Pick a start and end date to count the number of weekdays (business days) and weekend days between them.
Monday to Friday are work days; listed dates on weekdays are excluded. Both the start and end dates are counted. When adding, the start date itself is not counted.
Enter valid dates (end not before start, at most 100,000 days), holidays as YYYY-MM-DD and a non-zero whole number of work days up to 10,000.
How work days are counted
This calculator steps through every calendar day between your start and end dates (inclusive) and classifies each one as either a weekday (Monday through Friday) or a weekend day (Saturday or Sunday).
It doesn't exclude public holidays, since these vary widely by country, region, and even employer — if you need to exclude specific holidays, subtract them manually from the work days total shown here.
Frequently asked questions
Does this calculator account for public holidays?
No — it only excludes Saturdays and Sundays. Public holidays differ by country and organization, so you'll need to subtract any that apply to your situation separately.
Does the count include both the start and end date?
Yes, both the start date and end date are included in the count if they fall within the range being measured.
How is this different from the date difference calculator?
The date difference calculator counts every calendar day; this calculator specifically separates that count into weekdays and weekend days.
Are public holidays included?
Public holidays differ by country and region, so none are built in. Enter the holidays and other days off that apply to you; those falling on Monday–Friday are excluded from work days and shown separately. A date on a weekend is already a non-working day and is not counted twice.
How we verified this calculator
The calculator is checked against 3 reference cases computed independently of its code. Last passed: .
| # | Inputs | Expected result |
|---|---|---|
| 1 |
Calculation = Work days between two dates
Start date = 2026-01-01
End date = 2026-01-31
Holidays and days off (YYYY-MM-DD, separated by commas or new lines) = 2026-01-01, 2026-01-06
2026-01-10
|
Work days: 20
Weekend days: 9
Holidays on weekdays: 2
Calendar days: 31
|
| 2 |
Calculation = Work days between two dates
Start date = 2026-11-01
End date = 2026-11-30
Holidays and days off (YYYY-MM-DD, separated by commas or new lines) =
|
Work days: 21
Weekend days: 9
Holidays on weekdays: 0
Calendar days: 30
|
| 3 |
Calculation = Work days between two dates
Start date = 2026-11-24
End date = 2026-11-24
Holidays and days off (YYYY-MM-DD, separated by commas or new lines) =
|
Work days: 1
Weekend days: 0
Holidays on weekdays: 0
Calendar days: 1
|