Estimate a 3D print job: material, electricity and machine time, a failed-print allowance, then a margin for the suggested price and profit.
Enter finite values within the stated ranges and valid combinations.
Calculation and assumptions
C_m=g·price_kg/1000; C_e=h·W·price_kWh/1000; C_machine=h·rate; total=round(C_m)+round(C_e)+round(C_machine)+fixed.
Cost with failures = total × (1 + allowance/100); price = that cost × (1 + margin/100); profit = price − cost with failures. Each step rounds half up to two decimals. Material and electricity prices are your own inputs; no taxes are added.
Frequently asked questions
How is the result calculated?
C_m=g·price_kg/1000; C_e=h·W·price_kWh/1000; C_machine=h·rate; total=round(C_m)+round(C_e)+round(C_machine)+fixed.
What assumptions apply?
Cost with failures = total × (1 + allowance/100); price = that cost × (1 + margin/100); profit = price − cost with failures. Each step rounds half up to two decimals. Material and electricity prices are your own inputs; no taxes are added.
How precise are the results?
Monetary totals use two decimal places, with exact halves rounded away from zero at the steps described. Ratios and other numbers show up to ten significant digits. Display precision does not improve input accuracy.
How we verified this calculator
The calculator is checked against 5 reference cases computed independently of its code. Last passed: .
| # | Inputs | Expected result |
|---|---|---|
| 1 |
Material used (g) = 100
Entered material price (/kg) = 20
Job duration (h) = 5
Average electrical input power (W) = 200
Entered electricity price (/kWh) = 0.2
Entered machine-use rate (/h) = 1
Other fixed job cost = 0.5
Failed-print allowance (%) = 10
Margin (%) = 30
|
Material cost: 2.00
Electricity cost: 0.20
Machine-use cost: 5.00
Total entered-cost estimate: 7.70
|
| 2 |
Material used (g) = 50
Entered material price (/kg) = 800
Job duration (h) = 3
Average electrical input power (W) = 150
Entered electricity price (/kWh) = 4.32
Entered machine-use rate (/h) = 0
Other fixed job cost = 15
Failed-print allowance (%) = 10
Margin (%) = 50
|
Material cost: 40.00
Electricity cost: 1.94
Machine-use cost: 0.00
Total entered-cost estimate: 56.94
|
| 3 |
Material used (g) = 0
Entered material price (/kg) = 0
Job duration (h) = 0
Average electrical input power (W) = 0
Entered electricity price (/kWh) = 0
Entered machine-use rate (/h) = 0
Other fixed job cost = 0
Failed-print allowance (%) = 0
Margin (%) = 0
|
Material cost: 0.00
Electricity cost: 0.00
Machine-use cost: 0.00
Total entered-cost estimate: 0.00
|
| 4 |
Material used (g) = 250
Entered material price (/kg) = 25
Job duration (h) = 12.5
Average electrical input power (W) = 350
Entered electricity price (/kWh) = 0.31
Entered machine-use rate (/h) = 0.5
Other fixed job cost = 2
Failed-print allowance (%) = 100
Margin (%) = 0
|
Material cost: 6.25
Electricity cost: 1.36
Machine-use cost: 6.25
Total entered-cost estimate: 15.86
|
| 5 |
Material used (g) = 1
Entered material price (/kg) = 1
Job duration (h) = 1
Average electrical input power (W) = 1
Entered electricity price (/kWh) = 1
Entered machine-use rate (/h) = 1
Other fixed job cost = 1
Failed-print allowance (%) = 2.5
Margin (%) = 12.5
|
Material cost: 0.00
Electricity cost: 0.00
Machine-use cost: 1.00
Total entered-cost estimate: 2.00
|