Backup Power Runtime and Capacity
Estimate runtime from nominal watt-hours and the nominal capacity needed for a target duration.
Enter a finite value within the formula’s domain and supported numeric range.
P = Pₗ/η+P₀; t = E·u/P; Eᵣ = P·tᵣ/u; Q = Eᵣ/V·1000; Pᵍ = Pₗ(1+w/100). Energy projections assume the entered rates and do not model weather, starting loads or tariff changes beyond the stated inputs. Decimal input uses a dot, up to 12 digits before and after it, and an optional exponent from −24 to 24. Input magnitudes are limited to 10¹²; each formula has additional domain limits. Displayed approximate results use up to 12 significant digits.
Method, assumptions and limits
Estimate runtime from nominal watt-hours and the nominal capacity needed for a target duration.
P = Pₗ/η+P₀; t = E·u/P; Eᵣ = P·tᵣ/u; Q = Eᵣ/V·1000; Pᵍ = Pₗ(1+w/100). Energy projections assume the entered rates and do not model weather, starting loads or tariff changes beyond the stated inputs.
Decimal input uses a dot, up to 12 digits before and after it, and an optional exponent from −24 to 24. Input magnitudes are limited to 10¹²; each formula has additional domain limits. Displayed approximate results use up to 12 significant digits.
Frequently asked questions
How should I interpret this estimate?
P = Pₗ/η+P₀; t = E·u/P; Eᵣ = P·tᵣ/u; Q = Eᵣ/V·1000; Pᵍ = Pₗ(1+w/100). Energy projections assume the entered rates and do not model weather, starting loads or tariff changes beyond the stated inputs. Decimal input uses a dot, up to 12 digits before and after it, and an optional exponent from −24 to 24. Input magnitudes are limited to 10¹²; each formula has additional domain limits. Displayed approximate results use up to 12 significant digits.
How do I size a power bank or generator for an outage?
List each device as "watts quantity", set usable fraction to 100 %, inverter efficiency to about 85 % and the outage length as the target. The energy needed is load ÷ efficiency × hours; capacity in mAh uses the entered voltage (3.7 V for most power banks). The generator line adds the entered margin (25 % by default); round it up to the next available generator size.
How we verified this calculator
The calculator is checked against 2 reference cases computed independently of its code. Last passed: .
| # | Inputs | Expected result |
|---|---|---|
| 1 |
Load input = Load list
Rows: W quantity; one row per line = 150 1
10 1
40 1
20 1
Target runtime (h) = 8
Inverter efficiency (%) = 85
Usable fraction (%) = 100
Nominal battery energy (Wh) = 1000
Battery-side idle draw (W) = 0
Battery voltage (V; optional) = 3.7
Added power margin (%) = 25
|
Total load (W): 220
Estimated runtime (h): 3.86363636364
Nominal energy needed for target (Wh): 2070.58823529
Nominal capacity at entered voltage (mAh): 559618.441971
|
| 2 |
Load input = Load list
Rows: W quantity; one row per line = 60 2
5 3
Target runtime (h) = 12
Inverter efficiency (%) = 90
Usable fraction (%) = 80
Nominal battery energy (Wh) = 500
Battery-side idle draw (W) = 4
Battery voltage (V; optional) = 12
Added power margin (%) = 30
|
Total load (W): 135
Estimated runtime (h): 2.5974025974
Nominal energy needed for target (Wh): 2310
Nominal capacity at entered voltage (mAh): 192500
|