Predetermined Overhead Allocation
Calculate using the labelled inputs: Predetermined Overhead Allocation.
Enter a finite value within the formula’s domain and supported numeric range.
Calculation and assumptions
rate=budget/estimated_units; job=rate·job_units; applied=rate·actual_units; variance=applied−actual_cost.
Choose one allocation basis such as machine-hours and use it consistently. Budgeted units must be positive. The rate is not rounded before allocation; job and total amounts each round once to cents, halves away from zero. Positive variance means overapplied overhead, negative means underapplied. No accounting policy is selected. In one chosen two-decimal currency; no taxes or current market rates are supplied.
Values must satisfy the formula’s domain. Nonzero results too small or too large for reliable representation are rejected.
Frequently asked questions
How is the result calculated?
rate=budget/estimated_units; job=rate·job_units; applied=rate·actual_units; variance=applied−actual_cost.
What assumptions apply?
Choose one allocation basis such as machine-hours and use it consistently. Budgeted units must be positive. The rate is not rounded before allocation; job and total amounts each round once to cents, halves away from zero. Positive variance means overapplied overhead, negative means underapplied. No accounting policy is selected. In one chosen two-decimal currency; no taxes or current market rates are supplied.
How precise are the results?
Monetary totals use two decimal places, with exact halves rounded away from zero at the steps described. Ratios and other numbers show up to ten significant digits. Display precision does not improve input accuracy. Values must satisfy the formula’s domain. Nonzero results too small or too large for reliable representation are rejected.
How we verified this calculator
The calculator is checked against 3 reference cases computed independently of its code. Last passed: .
| # | Inputs | Expected result |
|---|---|---|
| 1 |
Budgeted overhead for the period = 600000
Budgeted allocation units = 20000
Allocation units used by the job = 150
Actual allocation units for the whole period = 21000
Actual overhead for the whole period = 615000
|
Predetermined cost per allocation unit: 30
Overhead allocated to the job: 4500.00
Total overhead applied in the period: 630000.00
Applied minus actual overhead: 15000.00
|
| 2 |
Budgeted overhead for the period = 250000
Budgeted allocation units = 12500
Allocation units used by the job = 40
Actual allocation units for the whole period = 12000
Actual overhead for the whole period = 245000
|
Predetermined cost per allocation unit: 20
Overhead allocated to the job: 800.00
Total overhead applied in the period: 240000.00
Applied minus actual overhead: -5000.00
|
| 3 |
Budgeted overhead for the period = 1000000
Budgeted allocation units = 40000
Allocation units used by the job = 37.5
Actual allocation units for the whole period = 38000
Actual overhead for the whole period = 960000
|
Predetermined cost per allocation unit: 25
Overhead allocated to the job: 937.50
Total overhead applied in the period: 950000.00
Applied minus actual overhead: -10000.00
|